Progress!

Plastic is up on 3/4 of the greenhouse,  it is really starting to come together!

 

Thanks to the help new DEAP interns we got the plastic on the side walls.

 

      

Installing welded wire to strengthen the frame,  there is going to be a lot of water in this tank!

 

This will be the floating raft tank where the plants are grown.  Next step foam lining all of the sides and then the bottom.   After that the install of the pond liner.